본문 바로 가기

로고

국내 최대 기계·건설 공학연구정보
통합검색 화살표
  • 시편절단기 Mecatome T210
  • 물성치테이블

    영문 : Comparison of ultimate bond strength models

    2020-01-13

    International Journal of STEEL STRUCTURES Vol.19 No.6 2019 (ste-i-1906) - pComparative Study of Ultimate Bond Strength Models for FRP-to-Steel Bonded Joints

    Test result

    2020-01-13

    International Journal of STEEL STRUCTURES Vol.19 No.6 2019 (ste-i-1906)2 - pComparative Study of Ultimate Bond Strength Models for FRP-to-Steel Bonded Joints

    Test result

    2020-01-13

    International Journal of STEEL STRUCTURES Vol.19 No.6 2019 (ste-i-1906)1 - pComparative Study of Ultimate Bond Strength Models for FRP-to-Steel Bonded Joints

    영문 : Type and location of maximum stress at the vessel-nozzle juncture

    2020-01-08

    International Journal of STEEL STRUCTURES Vol.19 No.6 2019 (ste-i-1906)1 - pComprehensive Evaluation of SCF for Spherical Pressure Vessels Intersected by Radial Cylindrical Noz..

    On-time operation rate for first quarter

    2020-01-08

    한국철도학회논문집 Vol.22 No.11 Nov. 2019 (rai-j-2211)based on final station arrival time interval, 20XX. - pImprovement of Calculation of On-Time Ratio Considering
    Train Operation Characteristics in Metro

    Number of trains within specified time range

    2020-01-08

    한국철도학회논문집 Vol.22 No.11 Nov. 2019 (rai-j-2211)based on final station arrival time interval, 20XX - pImprovement of Calculation of On-Time Ratio Considering
    Train Operation Characteristics in Metro

    On-time operation rate by route in first quarter

    2020-01-08

    한국철도학회논문집 Vol.22 No.11 Nov. 2019 (rai-j-2211)based on final station arrival time, January-March, 20XX - pImprovement of Calculation of On-Time Ratio Considering
    Train Operation Characteristics in Metro

    On-time operation rate for first quarter

    2020-01-08

    한국철도학회논문집 Vol.22 No.11 Nov. 2019 (rai-j-2211)based on final station arrival time, January-March, 20XX. - pImprovement of Calculation of On-Time Ratio Considering
    Train Operation Characteristics in Metro

    Number of trains within specified time range

    2020-01-08

    한국철도학회논문집 Vol.22 No.11 Nov. 2019 (rai-j-2211)based on final station arrival time, January-March, 20XX. - pImprovement of Calculation of On-Time Ratio Considering
    Train Operation Characteristics in Metro

    Status of on-time operation by route

    2020-01-07

    한국철도학회논문집 Vol.22 No.11 Nov. 2019 (rai-j-2211)2014 [12]. - pImprovement of Calculation of On-Time Ratio Considering
    Train Operation Characteristics in Metro

    Status of on-time operation by train type

    2020-01-07

    한국철도학회논문집 Vol.22 No.11 Nov. 2019 (rai-j-2211)2014 [12]. - pImprovement of Calculation of On-Time Ratio Considering
    Train Operation Characteristics in Metro

    Status of delay by railway operating company

    2020-01-07

    한국철도학회논문집 Vol.22 No.11 Nov. 2019 (rai-j-2211)2018 [9]. - pImprovement of Calculation of On-Time Ratio Considering
    Train Operation Characteristics in Metro

    Status of delay by railway type

    2020-01-07

    한국철도학회논문집 Vol.22 No.11 Nov. 2019 (rai-j-2211)2016-2018 [8]. - pImprovement of Calculation of On-Time Ratio Considering
    Train Operation Characteristics in Metro

    Number of safety accidents by operating institutions nationwide in 2017

    2020-01-07

    한국철도학회논문집 Vol.22 No.11 Nov. 2019 (rai-j-2211)case [5]. - pImprovement of Calculation of On-Time Ratio Considering
    Train Operation Characteristics in Metro

    Seoul Metropolitan Rapid Transit Corporation yearly train delay target

    2020-01-07

    한국철도학회논문집 Vol.22 No.11 Nov. 2019 (rai-j-2211)Maximum number of years. - pImprovement of Calculation of On-Time Ratio Considering
    Train Operation Characteristics in Metro

    서브 사이드

    서브 우측상단1