본문 바로 가기

로고

국내 최대 기계 및 로봇 연구정보
통합검색 화살표
  • 시편절단기 Mecatome T260
  • 기술보고서

    기술보고서 게시판 내용
    타이틀 L-Band System Engineering - Concepts of Use, Systems Performance Requirements, and Architecture
    저자 Henriksen, Stephen;; Zelkin, Natalie
    Keyword AIR TRAFFIC CONTROL;; AIRSPACE;; DATA TRANSMISSION;; FUNCTIONAL ANALYSIS;; MOBILE COMMUNICATION SYSTEMS;; PULSE COMMUNICATION;; RADIO COMMUNICATION;; SAFETY FACTORS;; SPECIFICATIONS;; TEST STANDS;; ULTRAHIGH FREQUENCIES
    URL http://hdl.handle.net/2060/20110014983
    보고서번호 NASA/CR-2011-217010
    발행년도 2011
    출처 NTRS (NASA Technical Report Server)
    ABSTRACT This document is being provided as part of ITT s NASA Glenn Research Center Aerospace Communication Systems Technical Support (ACSTS) contract NNC05CA85C, Task 7: New ATM Requirements-Future Communications, C-band and L-band Communications Standard Development. Task 7 was motivated by the five year technology assessment performed for the Federal Aviation Administration (FAA) under the joint FAA-EUROCONTROL cooperative research Action Plan (AP-17), also known as the Future Communications Study (FCS). It was based on direction provided by the FAA project-level agreement (PLA FY09_G1M.02-02v1) for "New ATM Requirements-Future Communications." Task 7 was separated into two distinct subtasks, each aligned with specific work elements and deliverable items. Subtask 7-1 addressed C-band airport surface data communications standards development, systems engineering, test bed development, and tests/demonstrations to establish operational capability for what is now referred to as the Aeronautical Mobile Airport Communications System (AeroMACS). Subtask 7-2, which is the subject of this report, focused on preliminary systems engineering and support of joint FAA/EUROCONTROL development and evaluation of a future L-band ꀀ to 1164 MHz) air/ground (A/G) communication system known as the L-band digital aeronautical communications system (L-DACS), which was defined during the FCS. The proposed L-DACS will be capable of providing ATM services in continental airspace in the 2020+ timeframe. Subtask 7-2 was performed in two phases. Phase I featured development of Concepts of Use, high level functional analyses, performance of initial L-band system safety and security risk assessments, and development of high level requirements and architectures. It also included the aforementioned support of joint L-DACS development and evaluation, including inputs to L-DACS design specifications. Phase II provided a refinement of the systems engineering activities performed during Phase I, along with continued joint FAA/EUROCONTROL L-DACS development and evaluation support.

    서브 사이드

    서브 우측상단1