    타이틀 Lessons Learned in Engineering
    저자 Blair, J. C.;; Ryan, R. S.;; Schutzenhofer, L. A.
    Keyword AEROSPACE SYSTEMS;; CONTRACTORS;; FAILURE ANALYSIS;; LAUNCH VEHICLES;; LESSONS LEARNED;; MANUFACTURING;; NASA PROGRAMS;; SYSTEMS ENGINEERING
    URL http://hdl.handle.net/2060/20110012689
    보고서번호 NASA/CR-2011-216468
    발행년도 2011
    출처 NTRS (NASA Technical Report Server)
    ABSTRACT This Contractor Report (CR) is a compilation of Lessons Learned in approximately 55 years of engineering experience by each James C. Blair, Robert S. Ryan, and Luke A. Schutzenhofer. The lessons are the basis of a course on Lessons Learned that has been taught at Marshall Space Flight Center. The lessons are drawn from NASA space projects and are characterized in terms of generic lessons learned from the project experience, which are further distilled into overarching principles that can be applied to future projects. Included are discussions of the overarching principles followed by a listing of the lessons associated with that principle. The lesson with sub-lessons are stated along with a listing of the project problems the lesson is drawn from, then each problem is illustrated and discussed, with conclusions drawn in terms of Lessons Learned. The purpose of this CR is to provide principles learned from past aerospace experience to help achieve greater success in future programs, and identify application of these principles to space systems design. The problems experienced provide insight into the engineering process and are examples of the subtleties one experiences performing engineering design, manufacturing, and operations.

    서브 사이드

    서브 우측상단1